Every dated rule change, deadline and consultation close that matters to Northern Ireland businesses and councils on carbon, energy, environment, waste and packaging, chemicals and PFAS, products, trade, customs and CBAM, and the Windsor Framework, from November 2026 to December 2028, on one page. Each date says who it affects, where it applies, how firm it is and what to do, and links to the official source it was checked against. Bookmark this page: it is updated when dates move, and each month and each row has its own link.
At a glance
The next 90 days
From 11 November 2026 to 9 February 2027. Select a date to jump to its row.
- Nov 2026NI NI Water submits its PC28 business planExpected
- 13 Nov 2026UK HMRC feedback window on UK CBAM emissions guidance closesConfirmed
- 20 Nov 2026UK–EU UK–EU summit in Brussels (held)Confirmed
- 21 Nov 2026NI Plastic waste exports to non-OECD countries bannedConfirmed
- Dec 2026EU ECHA's final opinion on the universal PFAS restriction dueExpected
- Dec 2026UK First UK CBAM rates (for January to March 2027) publishedConfirmed
- Dec 2026EU Commission due to adopt CBAM acts on certificate sales and carbon prices paid abroadExpected
- 9 Dec 2026NI New EU product liability rules apply to products placed on the NI marketConfirmed
- 11 Dec 2026EU EU ministers aim to agree their position on the EU ETS reviewExpected
- 15 Dec 2026NI DfE biomethane strategy consultation closesProposed
- 30 Dec 2026NI EU deforestation rules apply in NI to medium and large firms, and to all firms placing wood productsConfirmed
- 31 Dec 2026UK ESOS phase 4 qualification dateIn force
- Jan 2027NI Digital waste tracking becomes mandatory for NI receiving sitesExpected
- 1 Jan 2027UK UK CBAM startsConfirmed
- 1 Jan 2027NI EU F-gas bans on new cooling and heat pump kit; HFC supply halvesConfirmed
- 1 Jan 2027UK Listed companies report against UK Sustainability Reporting StandardsConfirmed
- 1 Jan 2027UK–EU UK CBAM: intended exemption for EU, EEA and Swiss-origin goodsProposed
- 4 Jan 2027EU EU publishes the Q4 2026 CBAM certificate priceConfirmed
- 12 Jan 2027UK Consultation on fixed price certificates in the Renewables Obligation closesProposed
- 20 Jan 2027NI EU Machinery Regulation applies in NIConfirmed
- 20 Jan 2027UK Consultation on adding refinery products to UK CBAM closesConfirmed
- 29 Jan 2027NI FSA consultation on NI food contact materials rules closesProposed
- 1 Feb 2027EU EU CBAM certificates go on saleConfirmed
Dates per month
How the dates bunch. The busiest months are January 2027 (10), December 2026 (8) and January 2028 (8).
In force or confirmedExpected or proposed
Every date, month by month
71 dates, soonest first. A month without a day means the official source gives only the month. "Where" is where the rule applies; "Status" is how firm the date is (see how to read this page). The source in each row is the page the date was checked on, on 11 November 2026.
| When | What happens | Who it affects | Where | Status | Action needed | Official source |
|---|---|---|---|---|---|---|
| November 2026 | ||||||
| this month | Environment · MilestoneNI Water submits its PC28 business plan NI Water's business plan for the 2028–2033 price control goes to the Utility Regulator. It sets out what NI Water says it needs for water and wastewater, including the capacity that decides where new homes and premises can connect. The Utility Regulator gives the month, not a day. On this site: NI Public Realm: Water, Roads and Floods dashboard | NI | Expected | Councils and developers: note what the plan says about wastewater capacity in the places you need connections, ready for the draft determination in June 2027. | Decision published on approach to PC28, NI Water's next price control (Utility Regulator) | |
| in 2 days | Trade, customs and CBAM · Consultation closeHMRC feedback window on UK CBAM emissions guidance closes HMRC invites technical feedback on its guidance for monitoring, verifying and reporting emissions under the UK CBAM, by email to cbampolicyteam@hmrc.gov.uk with 'MRV technical guidance feedback' in the subject line. HMRC says it may update the guidance before 1 January 2027. A request for technical feedback on published guidance, not a formal consultation. On this site: NI Consultations Monitor | UK | Confirmed | If your overseas suppliers will struggle with HMRC’s monitoring or verification rules, say so by 13 November. | CBAM: technical guidance for monitoring, verifying and reporting emissions (HMRC, updated 10 November 2026) | |
| in 9 days | Trade, customs and CBAM · DecisionUK–EU summit in Brussels (held) The second UK–EU summit concluded negotiations on linking the UK and EU emissions trading systems, a food and farm-goods (SPS) agreement and a Youth Experience Scheme. None is law yet: each needs signature, ratification and legislation. Nothing changes for either CBAM until each side makes its own legal act. The Joint Statement is a political declaration and the explainers are government guides. The legal texts were not published on 20 November 2026. On this site: The carbon deal: what changes, and when | UK–EU | Confirmed | Plan on UK CBAM applying from 1 January 2027 until exempting regulations are made. Get the origin of every CBAM good in writing. | UK/EU Summit 2026: Key documents (Cabinet Office, 20 November 2026) | |
| in 10 days | Waste and packaging · Rule changePlastic waste exports to non-OECD countries banned Under the EU Waste Shipments Regulation (EU) 2024/1157, which applies in Northern Ireland, plastic waste can no longer be exported to countries outside the OECD, at least until 21 May 2029. On this site: EU Law and the Windsor Framework dashboard | NI | Confirmed | Ask your waste contractor or broker where your plastic waste goes and get it in writing. Councils: check the end destinations in your recycling contracts. | Plastic waste shipments (European Commission) | |
| December 2026 | ||||||
| in 20 days | Chemicals and PFAS · DecisionECHA's final opinion on the universal PFAS restriction due ECHA plans to send its final opinion on restricting PFAS across the EU to the European Commission later in 2026 and at the latest by the end of 2026. The Commission and member states then decide in 2027. Any restriction would apply in NI through EU REACH. Timetable as published in February 2026; ECHA may move it. On this site: Forever chemicals, two rulebooks (updated 16 Nov 2026) | EU | Expected | List the PFAS uses in your products and processes (coatings, seals, foams, fluoropolymers) and ask suppliers which they can replace. | Next steps in ECHA's assessment of the universal PFAS restriction (ECHA presentation, EMA, 4 February 2026) | |
| in 20 days | Trade, customs and CBAM · MilestoneFirst UK CBAM rates (for January to March 2027) published HMRC publishes UK CBAM rates by the beginning of each quarter from 1 January 2027, so the January to March 2027 rates appear by 1 January and later ones by 1 April, 1 July and 1 October 2027. They replace the illustrative rates published on 16 October 2026 (iron and steel £9.69, aluminium £9.79, cement £8.78, fertiliser £1.45, hydrogen £9.24 per tCO2e). On this site: CBAM Exposure Tracker | UK | Confirmed | Reprice 2027 import budgets and customer quotes using the published rate for your goods. | Rates for the Carbon Border Adjustment Mechanism (HMRC, updated 20 October 2026) | |
| in 20 days | Trade, customs and CBAM · Rule changeCommission due to adopt CBAM acts on certificate sales and carbon prices paid abroad Two EU acts were consulted on in 2026 and are not yet adopted: the rules for selling and repurchasing CBAM certificates on the common central platform, and the rules for deducting a carbon price paid in a third country. The Commission says the carbon price act will be adopted in 2026, in time for declarations due by 30 September 2027. Neither act was on the Commission’s list of adopted acts at 11 November 2026. The December timing for the certificate act comes from secondary reports. Goods made in NI are outside the EU CBAM. On this site: CBAM Exposure Tracker | EU | Expected | If you sell from Great Britain to EU customers, keep evidence of UK ETS costs your plant actually pays, net of free allowances. | CBAM legislation and guidance (European Commission) | |
| in 28 days | Products · Rule changeNew EU product liability rules apply to products placed on the NI market The Product Liability Directive (EU) 2024/2853 applies to products placed on the NI market or put into service on or after 9 December 2026. It brings software, digital files and online sellers within strict liability for defective products. On this site: EU Law and the Windsor Framework dashboard | NI | Confirmed | Check your product liability insurance and supply contracts cover products sold into NI from this date, including any software or connected features. | Explanatory memorandum on Directive (EU) 2024/2853 (Department for Business and Trade, via the NI Assembly) | |
| in 30 days | Carbon · DecisionEU ministers aim to agree their position on the EU ETS review The Irish Council Presidency aims for a general approach at the Environment Council on the Commission’s July 2026 proposal to revise the EU ETS, which would extend free allocation to 2040 and slow the phase-in of the EU CBAM to 2038 instead of 2034. Talks with the European Parliament follow. The 11 December date is the Presidency’s target and may move. On this site: CBAM Exposure Tracker | EU | Expected | If you sell CBAM goods from Great Britain into the EU, treat any cost figure for 2028 to 2034 as a range until the law is settled. | Council of the EU background note on the EU ETS review (ST 13435/26) | |
| in 34 days | Energy · Consultation closeDfE biomethane strategy consultation closes Department for the Economy consultation on a Biomethane Strategy and Policy Framework for NI, covering energy and agricultural resilience, nutrient management and decarbonisation. Closes at 5pm. Closing date as recorded in the NI Consultations Monitor (checked on the DfE page, 6 November 2026) and in published coverage of the consultation. On this site: NI Consultations Monitor | NI | Proposed | If you produce slurry, digestate or food waste, or use gas, respond before 5pm on 15 December. | Biomethane Strategy and Policy Framework consultation (Department for the Economy) | |
| in 49 days | Environment · Rule changeEU deforestation rules apply in NI to medium and large firms, and to all firms placing wood products The EU Deforestation Regulation applies in NI from 30 December 2026 to medium and large operators, and to micro and small operators of products already under the EU Timber Regulation. Covers cattle, cocoa, coffee, palm oil, rubber, soya and wood. DAERA enforces for cattle, cocoa, coffee, palm oil and soy; OPSS for wood and rubber. On this site: NI Food and Drink Processing dashboard | NI | Confirmed | First placers on the NI market: collect plot geolocation from suppliers and file due diligence statements before goods are placed after 30 December. | Moving, exporting or placing deforestation-free products on the market in Northern Ireland (GOV.UK, updated 27 August 2026) | |
| in 50 days | Energy · DeadlineESOS phase 4 qualification date An undertaking is in ESOS phase 4 if on 31 December 2026 it, or its UK group, employs 250 or more people, or has turnover above £44m and a balance sheet above £38m. NIEA regulates organisations registered in NI. On this site: ESOS and the audit that pays only if you act (updated 16 Nov 2026) | UK | In force | Check headcount and group accounts as at 31 December. If you qualify, appoint a lead assessor early and pick a 12-month reference period ending before 5 December 2027. | How to comply with ESOS phase 4 (GOV.UK, published 30 July 2026) | |
| January 2027 | ||||||
| in 51 days | Waste and packaging · Rule changeDigital waste tracking becomes mandatory for NI receiving sites Transfer stations, scrap yards, landfills, energy-from-waste plants and composting sites in NI must record the waste they receive on the UK digital waste tracking service. England and Wales started in October 2026. Marked expected because the NI regulations were not yet made on 9 November 2026. GOV.UK's service page (updated 1 October 2026) also gives January 2027 for NI. On this site: The end of the paper trail: digital waste tracking (updated 16 Nov 2026) | NI | Expected | Receiving sites: join the public beta now and test your weighbridge and software links before January. | Digital waste tracking (NetRegs, for NIEA and SEPA) | |
| in 51 days | Trade, customs and CBAM · Rule changeUK CBAM starts The UK carbon border levy applies across the UK, NI included, to imported aluminium, cement, fertiliser, hydrogen, iron and steel of any non-UK origin, EU included: HMRC's guidance says no jurisdiction is exempt; on 20 November 2026 the government said it intends to exempt goods of EU, EEA and Swiss origin from 1 January 2027, which needs regulations. Liability starts once covered imports pass £50,000: looking back over the last 12 months (tested on the first of each month) or forward over the next 30 days (tested on any day). Union goods entering NI from Ireland or the EU count as imports under Finance Act 2026 s.144(5)(a); HMRC guidance does not yet cover this case. Charged on direct emissions, using global default values in 2027 and 2028 where supplier data is missing. Default values from Budget 2026 (HC 726, para 6.217): global in 2027 and 2028, country-specific from 2029. On this site: CBAM Exposure Tracker | UK | Confirmed | From 1 January keep a record for every covered import: commodity code, origin, mass, value and the supplier’s emissions data. Run the backward test on the first of each month, and check before any large delivery whether the next 30 days will take you past £50,000. | Carbon Border Adjustment Mechanism: policy summary (HMRC, updated 2 November 2026) | |
| in 51 days | Carbon · Rule changeEU F-gas bans on new cooling and heat pump kit; HFC supply halves Under the EU F-gas Regulation (EU) 2024/573, which applies in NI, these can no longer be placed on the market: plug-in and other self-contained air conditioning and heat pumps up to 50 kW with refrigerant GWP 150 or more; split air-to-water heat pumps up to 12 kW with GWP 150 or more; chillers up to 12 kW with GWP 150 or more and above 12 kW with GWP 750 or more (safety exceptions apply). The EU's maximum HFC quantity falls from 42.9 to 21.7 million tonnes CO2e a year for 2027–2029. Great Britain keeps its own rules. Kit placed on the market before 1 January 2027 can still be installed and serviced. On this site: Two refrigerant rulebooks, one small market (updated 16 Nov 2026) | NI | Confirmed | Specify low-GWP refrigerants for any cooling or heat pump kit bought for NI sites, and budget for dearer HFC servicing gas. | Regulation (EU) 2024/573 on fluorinated greenhouse gases, Annexes IV and VII (EUR-Lex) | |
| in 51 days | Carbon · Rule changeListed companies report against UK Sustainability Reporting Standards FCA rules require listed companies to report against the UK SRS on a comply-or-explain basis for accounting periods starting on or after 1 January 2027, with first reports in 2028. Their suppliers will be asked for emissions data. On this site: One data set, many requests (updated 16 Nov 2026) | UK | Confirmed | Suppliers to listed firms: have a Scope 1 and 2 footprint and a product-level method ready for customer questionnaires. | PS26/19: Aligning listed issuers' sustainability disclosures with international standards (FCA, 30 September 2026) | |
| in 51 days | Trade, customs and CBAM · Rule changeUK CBAM: intended exemption for EU, EEA and Swiss-origin goods The government said on 20 November 2026 that it intends to exempt goods originating in the EU, the EEA and Switzerland from UK CBAM from the day it starts. That needs Treasury regulations under the Finance Act 2026, which had not been made or published by 21 November 2026. Until they are, EU-origin goods entering NI are in scope. Origin means non-preferential origin under UK customs rules. The exempting regulations may set their own test. On this site: The carbon deal: what changes, and when | UK–EU | Proposed | Treat the exemption as likely, not as law. Keep origin evidence for every line, because goods of other origins stay charged. | UK-EU linking agreement: explainer (DESNZ, 20 November 2026) | |
| in 54 days | Trade, customs and CBAM · MilestoneEU publishes the Q4 2026 CBAM certificate price The European Commission publishes the last quarterly CBAM certificate price for 2026 imports. From 2027 it publishes weekly prices. The EU CBAM does not apply in NI; goods dispatched from NI do not trigger it. On this site: CBAM Exposure Tracker | EU | Confirmed | If you ship CBAM goods from GB or outside the EU direct to EU customers, use the price to settle who carries the 2026 cost. | Price of CBAM certificates (European Commission) | |
| in 62 days | Energy · Consultation closeConsultation on fixed price certificates in the Renewables Obligation closes DESNZ proposes replacing tradable certificates in the UK-wide Renewables Obligation schemes with fixed price certificates, covering pricing, supplier levies, reconciliation and transition. Closes at 11:59pm. The consultation page says UK-wide RO schemes but does not name NIRO; check the consultation document. On this site: NI Consultations Monitor | UK | Proposed | NI Renewables Obligation generators: check how the proposals treat NIRO and respond by 12 January. | Proposed implementation of fixed price certificates into the UK-wide RO schemes (DESNZ, 3 November 2026) | |
| in 70 days | Products · Rule changeEU Machinery Regulation applies in NI Regulation (EU) 2023/1230 replaces the Machinery Directive in NI under the Windsor Framework. Delegated acts adding AI safety-component requirements follow from 2 August 2028. GB continues to recognise CE marking for machinery. On this site: EU Law and the Windsor Framework dashboard | NI | Confirmed | Makers and importers: update technical files, instructions and declarations of conformity for machinery placed on the NI market from 20 January. | Assessment of impact on Regulation (EU) 2026/1744 amending the Machinery Regulation (DfE, via the NI Assembly) | |
| in 70 days | Trade, customs and CBAM · Consultation closeConsultation on adding refinery products to UK CBAM closes HM Treasury and HMRC seek views on the feasibility and impacts of bringing refinery products into UK CBAM in future. No start date is proposed. Closes at 11:59pm. The closing date is fixed; the scope expansion itself is only proposed, with no start date. On this site: NI Consultations Monitor | UK | Confirmed | If you import fuels or other refinery products from outside the UK, respond with your volumes and costs by 20 January. | CBAM: a consultation on sectoral scope expansion to include refinery products (HM Treasury and HMRC, 28 October 2026) | |
| in 79 days | Chemicals and PFAS · Consultation closeFSA consultation on NI food contact materials rules closes The Food Standards Agency in NI proposes the Materials and Articles in Contact with Food Regulations (Northern Ireland) 2027, updating and consolidating enforcement of EU rules on plastics, recycled plastics, bisphenol A, and PFAS and heavy metals in food-contact packaging. Closes at 11:59pm. On this site: NI Consultations Monitor | NI | Proposed | Food businesses and packaging suppliers: check your declarations of compliance cover BPA and PFAS limits, and respond by 29 January. | Proposed update and consolidation of NI's domestic legislative framework for food contact materials (FSA, 5 November 2026) | |
| February 2027 | ||||||
| in 82 days | Trade, customs and CBAM · MilestoneEU CBAM certificates go on sale EU importers buy CBAM certificates on the common central platform from February 2027, starting with certificates for goods imported in 2026. Regulation (EU) 2025/2083 sets the start of sales at 1 February 2027. The Commission act on the platform, fees and repurchase had not been adopted at 11 November 2026. The EU CBAM does not apply in NI: the Commission’s CBAM Q&A (Q7.14) says goods produced or released for free circulation in Northern Ireland are not subject to CBAM. On this site: CBAM Exposure Tracker | EU | Confirmed | EU customers will want verified emissions data to cut their certificate bill: have product-level figures ready for anything you ship from GB or outside the EU. | Price of CBAM certificates (European Commission) | |
| in 99 days | Products · Rule changeBattery passports and removability rules start Under the EU Batteries Regulation, which applies in NI: each EV battery, light-means-of-transport battery and industrial battery above 2 kWh placed on the market needs a digital battery passport, and portable batteries must be removable and replaceable by the user. QR code labels on all batteries apply from this date at the earliest, subject to further legislation. OPSS handles compliance queries; DAERA handles waste battery (Chapter 8) queries. On this site: Gold in the bin (updated 16 Nov 2026) | NI | Confirmed | Battery and device makers and importers: confirm passport data and design changes with suppliers for stock reaching NI after 18 February. | EU batteries regulations in Northern Ireland (GOV.UK, updated 17 October 2026) | |
| March 2027 | ||||||
| in 110 days | Carbon · DeadlineEU deadline to transpose the slimmed-down CSRD Member states must transpose the Omnibus I changes to the Corporate Sustainability Reporting Directive 12 months after the directive came into force (March 2027). In-scope EU groups now have more than 1,000 employees and over €450m turnover. CSRD is not in the Windsor Framework: NI firms are caught only through EU subsidiaries or EU turnover, or as suppliers. Transposition rule read in the adopted text (Council PE-CONS 66/25, Article 5). Published commentary gives 19 March 2027. On this site: One data set, many requests (updated 16 Nov 2026) | EU | Confirmed | If you have an EU subsidiary or large EU customers, confirm whether you are in scope under the new thresholds, and expect fewer but more targeted data requests. | Directive (EU) 2026/470 (Omnibus I), Official Journal, 26 February 2026 (EUR-Lex) | |
| in about 5 months | Carbon · DeadlineFirst UK ETS emissions reports for domestic shipping Ship operators in the UK ETS (domestic voyages from 1 July 2026, GB–NI sailings included) submit verified 2026 emissions reports. On this site: NI Transport and Fleet dashboard | UK | In force | Freight customers on GB–NI routes: ask your ferry operator how the carbon cost will appear on 2027 rates. | UK ETS scope expansion: domestic maritime, main Authority response (GOV.UK) | |
| in about 5 months | Trade, customs and CBAM · DeadlineEU importers must hold CBAM certificates at each quarter end From 2027, authorised EU CBAM declarants must hold certificates covering at least 50% of the embedded emissions of goods imported since the start of the year at the end of each quarter. The EPA is Ireland's CBAM competent authority. The first quarter end is 31 March 2027. On this site: CBAM Exposure Tracker | EU | Confirmed | Expect EU customers to ask for emissions data quarterly, not yearly, from 2027. | CBAM certificates (Environmental Protection Agency, Ireland) | |
| in about 5 months | Waste and packaging · DeadlineSimpler Recycling reaches micro-firms in England Workplaces in England with fewer than 10 full-time equivalent employees must separate recycling by 31 March 2027. It does not apply in NI. England only. On this site: Brown bins, black holes | GB | Confirmed | NI firms with small sites in England: arrange separate collections there before 31 March. | Simpler Recycling: workplace recycling in England (GOV.UK) | |
| April 2027 | ||||||
| in about 5 months | Energy · Rule changeGB manufacturers exempted from some electricity levies; NI scheme funded but not dated Under the British Industrial Competitiveness Scheme, eligible businesses in Great Britain are exempted from the indirect costs of the Renewables Obligation and Feed-in Tariffs from 1 April 2027, with the Capacity Market to follow. The NI Executive is being funded to deliver a comparable scheme; no start date has been given. GOV.UK's NI Budget release of 28 October 2026 gives no start date for the NI version. On this site: The price of a separate grid (updated 16 Nov 2026) | GB | Confirmed | NI manufacturers: ask DfE when the NI scheme opens and on what terms, and put the question to Assembly candidates. | Budget 2026, HC 726, paras 4.145 and 6.31 (HM Treasury, 28 October 2026) | |
| in about 5 months | Energy · Rule changeZero VAT on installed heat pumps and other energy-saving materials ends The zero rate on installing energy-saving materials in homes, heat pumps included, runs UK-wide (NI since 1 May 2023) until 31 March 2027. From 1 April 2027 they are reduced-rated, and heat batteries join the list. Heat batteries added to the reduced rate from 1 April 2027 by Budget 2026 (para 6.215). On this site: Two refrigerant rulebooks, one small market (updated 16 Nov 2026) | UK | Confirmed | Installers and housing providers: complete contracted installs before 1 April or price in the reduced rate. | VENSAV2083: VAT rates for energy-saving materials with commencement dates (HMRC manual) | |
| in about 5 months | Waste and packaging · Rule changePlastic Packaging Tax: mass balance allowed, pre-consumer plastic excluded Chemically recycled plastic can count as recycled content using a mass balance approach, and pre-consumer plastic no longer counts towards the 30% recycled content threshold. Plastic Packaging Tax applies UK-wide. On this site: Northern Ireland's waste bill (updated 16 Nov 2026) | UK | Confirmed | Check whether your recycled-content claims rely on pre-consumer scrap; if so, re-test against the 30% threshold. | Plastic Packaging Tax: mass balance approach and removal of pre-consumer plastic (HMRC policy paper) | |
| in about 5 months | Waste and packaging · Rule changeLandfill tax 2027–28 rates take effect The standard rate rises with RPI and the lower rate by the same cash amount (Budget 2026). The Landfill Communities Fund credit cap rises from 5.3% to 8.3%. Landfill tax applies in England and Northern Ireland. Rate uprating from Budget 2026, HC 726, para 6.221. On this site: Northern Ireland's waste bill (updated 16 Nov 2026) | UK | Confirmed | Councils and contractors: update 2027–28 disposal budgets and gate fees. | Landfill Communities Fund value 2027 to 2028 (HMRC, 28 October 2026) | |
| in about 5 months | Carbon · Rule changeZero emission company car tax rises to 5% The benefit-in-kind appropriate percentage for zero emission company cars is 5% for 2027–28, up from 4%. The policy paper gives 5% for zero emission cars in 2027–28 in its summary; its detailed table quotes only the overall maximum. On this site: NI Transport and Fleet dashboard | UK | Confirmed | Fleet managers: reflect the new rate in salary sacrifice and car policy quotes. | Taxation of company cars: appropriate percentage for 2025–26 to 2027–28 (HMRC policy paper) | |
| May 2027 | ||||||
| in about 6 months | Public affairs · EventNI Assembly and council elections Combined Assembly and local government elections. The new Executive and councils set the next Climate Action Plan, contaminated land, water funding and energy support decisions. On this site: When did your voice on a consultation last get heard? | NI | Confirmed | Put your asks to parties before manifestos close, early in 2027. | Local Government Elections 2027 (Causeway Coast and Glens Borough Council report, 28 April 2026, citing the Secretary of State) | |
| in about 6 months | Environment · DeadlineSoil Nutrient Health Scheme deadline for the Farm Sustainability Payment Farms must complete Soil Nutrient Health Scheme registration and training by the close of the 2027 single application window, or lose 10% of the Farm Sustainability Payment in 2027, rising to 15% in 2028. On this site: Focus on Agriculture, November 2026 | NI | Confirmed | Register and book training well before 15 May. | Farm Sustainability Payment conditionalities (DAERA, 23 February 2026) | |
| June 2027 | ||||||
| in about 7 months | Environment · MilestoneDraft determination for NI Water's PC28 price control The Utility Regulator publishes its draft determination for 2028–2033 for consultation. On this site: NI Public Realm: Water, Roads and Floods dashboard | NI | Expected | Respond on wastewater capacity in your area; this sets what is built to 2033. | Decision published on approach to PC28, NI Water's next price control (Utility Regulator) | |
| in about 8 months | Environment · Rule changeEU deforestation rules reach micro and small firms Micro and small operators placing cattle, cocoa, coffee, palm oil, rubber or soya products on the NI market must comply. Wood products were already covered from 30 December 2026. On this site: NI Hospitality, Retail and Leisure dashboard | NI | Confirmed | Smaller cafés, bakeries and processors: ask suppliers whether they are the first placer and who files the due diligence statement. | Moving, exporting or placing deforestation-free products on the market in Northern Ireland (GOV.UK, updated 27 August 2026) | |
| July 2027 | ||||||
| in about 8 months | Energy · Rule changeGB zero VAT on household electricity due to end; NI stays at 5% The temporary zero rate on domestic electricity in Great Britain, which began on 1 October 2026, was extended by the Budget to 1 July 2027. It has never applied in NI, where qualifying supplies stay at the reduced 5% rate. HMRC's GB guidance (updated 30 September 2026) still shows the original end date of 31 March 2027. Some site posts say 30 June 2027; the Budget text says 'to 1 July 2027'. On this site: The price of a separate grid (updated 16 Nov 2026) | GB | Confirmed | Watch for any further extension or comparable NI support; none was announced for NI households in the Budget. | Budget 2026, HC 726, para 6.210 (HM Treasury, 28 October 2026) | |
| in about 8 months | Energy · Rule changeFuel duty 5p cut and freeze end The temporary 5p a litre fuel duty cut and the freeze run to 1 July 2027 (red diesel included), after which rates step up. GOV.UK's NI Budget release says the cut is extended to 30 June 2027. On this site: NI Transport and Fleet dashboard | UK | Confirmed | Hauliers and contractors: build the July step into contract fuel clauses and quotes running past mid-2027. | Budget 2026, HC 726, para 6.211 (HM Treasury, 28 October 2026) | |
| August 2027 | ||||||
| in about 9 months | Products · DeadlineBattery due diligence duties enforceable Under the EU Batteries Regulation in NI, economic operators in scope must have supply-chain due diligence policies for battery raw materials. The thresholds may change. On this site: Gold in the bin (updated 16 Nov 2026) | NI | Confirmed | If you place batteries on the NI market above the turnover threshold, draft your due diligence policy and get it verified. | EU batteries regulations in Northern Ireland (GOV.UK, updated 17 October 2026) | |
| September 2027 | ||||||
| in about 11 months | Trade, customs and CBAM · DeadlineFirst EU CBAM annual declaration and surrender EU importers declare embedded emissions in goods imported during 2026 and surrender CBAM certificates. The EU CBAM does not apply in NI. On this site: CBAM Exposure Tracker | EU | Confirmed | Expect EU customers' final data requests over the summer; send verified actual emissions to replace default values. | CBAM certificates (Environmental Protection Agency, Ireland) | |
| October 2027 | ||||||
| in about 11 months | Waste and packaging · Rule changeDeposit return scheme goes live Single-use PET plastic, steel and aluminium drinks containers from 150ml to 3 litres carry a deposit in NI and England, run by UK Deposit Management Organisation Ltd, which sets the deposit. DAERA gives October 2027 without a day. On this site: Northern Ireland's waste bill (updated 16 Nov 2026) | NI | Confirmed | Drinks producers: register with the UK DMO and change labels. Shops: plan return points or check whether you qualify for an exemption. | Extended Producer Responsibility: deposit return scheme for single-use drinks containers (DAERA, updated 14 April 2026) | |
| in about 11 months | Waste and packaging · Rule changeDigital waste tracking extends to carriers, brokers and dealers Phase 2 of the digital waste tracking service is expected to become mandatory for waste carriers, brokers and dealers, after a public beta from April 2027. NetRegs and GOV.UK (updated 1 October 2026) both give October 2027. On this site: The end of the paper trail: digital waste tracking (updated 16 Nov 2026) | UK | Expected | Carriers and brokers: join the April 2027 beta; producers: ask your carrier how it will record your loads. | Digital waste tracking (NetRegs, for NIEA and SEPA) | |
| in about 11 months | Chemicals and PFAS · Rule changePFHxA ban extends to other consumer textiles and leather The EU REACH restriction on PFHxA and related substances (entry 79), which applies in NI, covers textiles, leather, furs and hides for the general public other than clothing from 10 October 2027. Clothing, footwear and paper food packaging were covered from 10 October 2026. Dates read in the Official Journal text of the regulation. On this site: Forever chemicals, two rulebooks (updated 16 Nov 2026) | NI | Confirmed | Retailers and upholsterers: get PFHxA-free declarations for soft furnishings, outdoor textiles and leather goods sold in NI. | Commission Regulation (EU) 2024/2462 (EUR-Lex) | |
| December 2027 | ||||||
| in about 13 months | Energy · DeadlineESOS phase 4 notification deadline Qualifying undertakings notify compliance with phase 4. NIEA is the regulator for organisations registered in NI. On this site: ESOS and the audit that pays only if you act (updated 16 Nov 2026) | UK | In force | Have the audit signed off by a lead assessor and the board in time to notify by 5 December. | How to comply with ESOS phase 4 (GOV.UK, published 30 July 2026) | |
| in about 13 months | Windsor Framework · Rule changeEU Forced Labour Regulation would apply in NI If the Joint Committee adds Regulation (EU) 2024/3015 to the Windsor Framework, products made with forced labour could not be placed on the NI market or exported from it from 14 December 2027. GB would have its own regime for businesses with turnover over £350 million. Depends on the Joint Committee decision expected on 10 November 2026. On this site: EU Law and the Windsor Framework dashboard | NI | Proposed | Map high-risk inputs (cotton, solar components, electronics, seafood) and supplier audits now. | Explanatory memorandum on Regulation (EU) 2024/3015 (UK Government, 4 November 2026) | |
| in about 14 months | Carbon · DeadlineNI's first carbon budget period ends The first budgetary period under the Climate Change Act (Northern Ireland) 2022 runs from 2023 to 2027, with an average annual emissions reduction of 33%. Budget level from DAERA's news release of 11 December 2024 on the Climate Change (Carbon Budgets 2023–2037) Regulations (NI) 2024. On this site: The Act that outran its plan (updated 16 Nov 2026) | NI | In force | Public bodies: align 2027–28 plans with the second budget, which starts the next day. | Climate Change Act (Northern Ireland) 2022, Part 2 (legislation.gov.uk) | |
| January 2028 | ||||||
| in about 14 months | Environment · DecisionFinal determination for NI Water's PC28 price control The Utility Regulator intends to publish its final determination for 2028–2033. On this site: NI Public Realm: Water, Roads and Floods dashboard | NI | Expected | Check which wastewater schemes are funded before committing to sites that need new connections. | Decision published on approach to PC28, NI Water's next price control (Utility Regulator) | |
| in about 14 months | Carbon · Rule changeNI's second carbon budget period starts The second budgetary period runs from 2028 to 2032, with an average annual emissions reduction of 48% set by the Climate Change (Carbon Budgets 2023–2037) Regulations (NI) 2024. On this site: The Act that outran its plan (updated 16 Nov 2026) | NI | In force | Expect the Climate Action Plan and sectoral plans for 2028–2032 to tighten what is asked of business and councils. | Muir welcomes Assembly approval of emissions targets (DAERA, 11 December 2024) | |
| in about 14 months | Chemicals and PFAS · Rule changeNew EU chemical label format, advertising and online-sales rules apply Regulation (EU) 2025/2439 postponed parts of the CLP revision to 1 January 2028: label formatting, updating labels, advertising, distance (online) selling and labelling at fuel stations. CLP applies in NI. Dates checked against a summary of the Official Journal text; the EUR-Lex page did not open from here. On this site: EU Law and the Windsor Framework dashboard | NI | Confirmed | Redesign labels and online listings for hazardous products sold in NI in time for 1 January 2028. | Regulation (EU) 2025/2439 amending the CLP revision's application dates (EUR-Lex) | |
| in about 14 months | Trade, customs and CBAM · DeadlineHMRC opens UK CBAM registration Businesses whose covered imports passed £50,000 in 2027 register with HMRC. On this site: CBAM Exposure Tracker | UK | Confirmed | Register as soon as it opens if you passed the threshold in 2027. | Carbon Border Adjustment Mechanism: policy summary (HMRC, updated 2 November 2026) | |
| in about 14 months | Waste and packaging · Rule changePackaging data collection by nation starts in NI NIEA's regulatory position statement delays collection of nation data, and of self-managed organisational waste data, under the packaging EPR regulations to 1 January 2028. Nation data is reported by 1 April 2029. NIEA will not normally take enforcement action before these dates; the legal duty is unchanged. On this site: Northern Ireland's waste bill (updated 16 Nov 2026) | NI | Confirmed | Large packaging producers: set up systems to record where packaging is sold by nation from 1 January 2028. | Packaging EPR regulatory position statement (NIEA, September 2026) | |
| in about 14 months | Trade, customs and CBAM · Rule changeProposed EU CBAM extension to downstream steel and aluminium goods would apply The Commission proposed in December 2025 (COM(2025) 989) to add steel- and aluminium-intensive downstream goods, such as machinery parts, fabrications and vehicle components, to the EU CBAM from 1 January 2028, with stronger anti-circumvention rules. The Council agreed its position on 12 June 2026 and the European Parliament on 15 September 2026; negotiations between them are under way. The UK has no equivalent proposal. Not law. The product list is not final. A second round of talks has been reported for 30 November 2026, but no institution has published a date. On this site: CBAM Exposure Tracker | EU | Proposed | If you make fabricated metal goods in Great Britain for EU customers, check whether your commodity codes are on the draft lists. Goods made in NI stay outside the EU CBAM. | Procedure 2025/0419(COD): CBAM downstream extension and anti-circumvention (European Parliament Legislative Observatory) | |
| in about 14 months | Trade, customs and CBAM · Rule changeUK–EU carbon market link intended to operate; EU CBAM exemption for UK goods expected UK and EU allowances become usable in either scheme. The EU exemption for UK-origin goods is expected from the same date and needs an EU act adding the UK to Annex III of Regulation (EU) 2023/956. NI electricity generators stay in the EU ETS. The temporary 50% reduction for NI–GB voyages is removed under the linking terms. Subject to signature, ratification and legislation on both sides. The Joint Statement says from 2028; 1 January is the aim given in the explainer. On this site: The carbon deal: what changes, and when | UK–EU | Expected | UK ETS sites: plan on the linked price and EU benchmarks for free allocation. Exporters: keep supplying CBAM data for 2026 and 2027 goods. | UK-EU linking agreement: explainer (DESNZ, 20 November 2026) | |
| in about 15 months | Trade, customs and CBAM · DeadlineUK CBAM registration deadline for 2027 Businesses that passed the £50,000 threshold during 2027 must register with HMRC by 31 January 2028. On this site: CBAM Exposure Tracker | UK | Confirmed | Register by 31 January; late registration risks penalties. | Carbon Border Adjustment Mechanism: policy summary (HMRC, updated 2 November 2026) | |
| February 2028 | ||||||
| in about 15 months | Environment · Rule changeLow emission slurry spreading on farms over 100 livestock units DAERA's proposed Nutrients Action Programme 2027–2030 would make low emission slurry spreading equipment mandatory by February 2028 for farms over 100 livestock units, by February 2029 for farms over 75 units (and large pig units) and by February 2030 for farms over 50 units. Consultation closed on 7 September 2026; the final programme was not published on 9 November 2026. On this site: Focus on Agriculture, November 2026 | NI | Proposed | Larger farms: price trailing shoe or injection kit or contractor rates, and watch for capital grants. | Consultation on the Nutrients Action Programme 2027–2030, section 4.2.3 (DAERA, June 2026) | |
| March 2028 | ||||||
| in about 16 months | Trade, customs and CBAM · Rule changeUK–EU food and farm-goods (SPS) agreement intended to apply A common sanitary and phytosanitary area between Great Britain and the EU, removing most certificates and checks, with the benefits extended to movements from Great Britain to NI through the Windsor Framework. NI already follows EU rules in this area. Subject to signature, ratification and legislation. The legal text was not published on 20 November 2026. | UK–EU | Expected | Food firms: plan 2027 on the rules as they stand. Watch for the legal text and for what customs formalities remain. | UK/EU Summit 2026: Key documents, Joint Statement paragraph 48 (Cabinet Office, 20 November 2026) | |
| April 2028 | ||||||
| in about 17 months | Carbon · Rule changeCarbon Price Support ends in Great Britain The government will end Carbon Price Support rates in Great Britain from April 2028. NI generators are in the EU ETS and do not pay it. The Budget says 'from April 2028' without a day; 1 April is the start of the levy year. On this site: CBAM Exposure Tracker | GB | Confirmed | Expect GB wholesale power prices to fall relative to the all-island market; factor this into GB–NI site cost comparisons. | Budget 2026, HC 726, para 6.208 (HM Treasury, 28 October 2026) | |
| in about 17 months | Energy · Rule changeClimate Change Levy: electricity rate frozen, gas rate rises Electricity and LPG main rates are frozen at 2027–28 levels; gas and solid fuel main rates rise by RPI. On this site: ESOS and the audit that pays only if you act (updated 16 Nov 2026) | UK | Confirmed | Use the widening gap between electricity and gas levy rates in the business case for electrifying heat. | Budget 2026, HC 726, para 6.209 (HM Treasury, 28 October 2026) | |
| in about 17 months | Environment · Rule changeNI Water's PC28 price control period starts PC28 covers 1 April 2028 to 31 March 2033 and sets NI Water's funding and outputs, including wastewater capacity. On this site: We don't fund the drains. Then we pay for the flood. | NI | Confirmed | Developers and councils: plan development phasing around the funded capacity schemes. | Decision published on approach to PC28, NI Water's next price control (Utility Regulator) | |
| in about 17 months | Carbon · Rule changeZero emission company car tax rises to 7% The appropriate percentage for zero emission company cars rises by 2 points a year in 2028–29 and 2029–30, from 5% to 7% on 6 April 2028. On this site: NI Transport and Fleet dashboard | UK | Confirmed | Fleet managers: model whole-life cost with the higher rates before renewing leases that run past April 2028. | Taxation of company cars: appropriate percentage for 2028–29 and 2029–30 (HMRC policy paper) | |
| in about 18 months | Carbon · DeadlineFirst UK ETS surrender for domestic shipping Ship operators surrender allowances for 2026 and 2027 emissions together. Voyages between GB and NI, in either direction, get a 50% deduction while the price gap with Republic of Ireland routes remains. On this site: NI Transport and Fleet dashboard | UK | In force | Freight buyers: check how ferry surcharges recover the 2026–27 cost and whether the 50% deduction is passed on. | UK ETS scope expansion: domestic maritime, main Authority response (GOV.UK) | |
| May 2028 | ||||||
| in about 18 months | Environment · DeadlineBovine Genetics deadline for the Farm Sustainability Payment Farms with cattle must complete Bovine Genetics Project registration and training by 15 May 2028, or lose 10% of the Farm Sustainability Payment in 2028, rising to 15% in 2029. On this site: Focus on Agriculture, November 2026 | NI | Confirmed | Register and complete training before the 2028 single application deadline. | Farm Sustainability Payment conditionalities (DAERA, 23 February 2026) | |
| in about 19 months | Trade, customs and CBAM · DeadlineFirst UK CBAM return and payment Registered importers file their first UK CBAM return and pay for the 2027 accounting period, five months after it ends. The Transitory Provision Regulations split the next period: returns and payment for January to March 2028 are due by 31 July 2028, and for April to June 2028 by 29 September 2028. Dates set by SI 2026/830, made 14 July 2026: https://www.legislation.gov.uk/uksi/2026/830/made On this site: CBAM Exposure Tracker | UK | Confirmed | Reconcile 2027 import records and supplier emissions data in early 2028 so the return and payment are ready by 31 May. | Carbon Border Adjustment Mechanism: policy summary (HMRC, updated 2 November 2026) | |
| July 2028 | ||||||
| in about 20 months | Trade, customs and CBAM · DeadlineEU deadline to transpose the narrowed due diligence directive Member states must transpose the Omnibus I changes to the Corporate Sustainability Due Diligence Directive by 26 July 2028; companies apply it from 26 July 2029. In scope: EU groups over 5,000 employees and €1.5bn turnover. Not in the Windsor Framework, but NI suppliers to large EU groups will be asked about their supply chains. Transposition date read in the adopted text (Council PE-CONS 66/25, Article 5). On this site: One data set, many requests (updated 16 Nov 2026) | EU | Confirmed | Suppliers to large EU groups: expect codes of conduct and supplier questionnaires; keep human rights and environmental records ready. | Directive (EU) 2026/470 (Omnibus I), Official Journal, 26 February 2026 (EUR-Lex) | |
| in about 21 months | Trade, customs and CBAM · DeadlineUK CBAM return and payment for January to March 2028 Registered importers file the UK CBAM return and pay for the period 1 January to 31 March 2028. On this site: CBAM Exposure Tracker | UK | Confirmed | Keep 2028 import records and supplier data quarterly from January 2028. | The Carbon Border Adjustment Mechanism (Transitory Provision) Regulations 2026 (SI 2026/830) | |
| September 2028 | ||||||
| in about 23 months | Trade, customs and CBAM · DeadlineUK CBAM return and payment for April to June 2028 Registered importers file the UK CBAM return and pay for the period 1 April to 30 June 2028. On this site: CBAM Exposure Tracker | UK | Confirmed | File and pay by 29 September 2028. | The Carbon Border Adjustment Mechanism (Transitory Provision) Regulations 2026 (SI 2026/830) | |
| in about 23 months | Carbon · DeadlineFirst surrender deadline accepting both UK and EU allowances The first compliance deadline under the linked schemes, covering 2027 emissions. Depends on the link operating from 1 January 2028. On this site: The carbon deal: what changes, and when | UK–EU | Expected | UK ETS operators: check registry changes and guidance from the UK ETS Authority during 2027. | UK-EU linking agreement: explainer (DESNZ, 20 November 2026) | |
| October 2028 | ||||||
| in about 23 months | Waste and packaging · DeadlineFirst self-managed packaging waste data report due in NI Under NIEA's regulatory position statement, self-managed organisational waste data collected from 1 January 2028 is reported on or before 1 October 2028. On this site: Northern Ireland's waste bill (updated 16 Nov 2026) | NI | Confirmed | Producers that manage their own packaging waste: keep records from January 2028 for the October report. | Packaging EPR regulatory position statement (NIEA, September 2026) | |
| December 2028 | ||||||
| in about 25 months | Windsor Framework · EventNext Assembly consent vote on the Windsor Framework trade articles The motion of 10 December 2024 on continuing Articles 5 to 10 passed by a simple majority, so the next democratic consent vote takes place four years on. The Assembly says 'in four years'; December 2028 is counted from the December 2024 vote, not a date the Assembly gives. On this site: EU Law and the Windsor Framework dashboard | NI | Expected | Trade bodies and firms that move goods GB–NI or NI–EU: build your evidence on how the arrangements work in practice during 2028. | Windsor Framework timeline (NI Assembly) | |
| in about 25 months | Energy · DeadlineESOS phase 4 action plan deadline Undertakings in phase 4 complete an ESOS action plan, followed by annual progress updates. On this site: ESOS and the audit that pays only if you act (updated 16 Nov 2026) | UK | In force | Choose the audit measures you will commit to, with costs and dates, and get board sign-off. | How to comply with ESOS phase 4 (GOV.UK, published 30 July 2026) | |
Passed since the last check (1)
- 10 Nov 2026: Withdrawal Agreement Joint Committee meets (source)
By topic and year
Dates by topic and year
Each date is counted once, under its main topic. Darker cells hold more dates.
| Topic | 2026 | 2027 | 2028 | Total |
|---|---|---|---|---|
| Carbon | 1 | 6 | 5 | 12 |
| Energy | 2 | 6 | 2 | 10 |
| Environment | 2 | 3 | 4 | 9 |
| Waste and packaging | 1 | 6 | 2 | 9 |
| Chemicals and PFAS | 1 | 2 | 1 | 4 |
| Products | 1 | 3 | 0 | 4 |
| Trade, customs and CBAM | 4 | 7 | 9 | 20 |
| Windsor Framework | 0 | 1 | 1 | 2 |
| Public affairs | 0 | 1 | 0 | 1 |
| All topics | 12 | 35 | 24 | 71 |
How firm the dates are
Expected and proposed dates are the ones most likely to move; they are rechecked first at each update.
| Status | 2026 | 2027 | 2028 | Total |
|---|---|---|---|---|
| In force | 1 | 3 | 3 | 7 |
| Confirmed | 6 | 25 | 14 | 45 |
| Expected | 4 | 3 | 5 | 12 |
| Proposed | 1 | 4 | 2 | 7 |
How to read this page
Status
- In force
- The law behind it already applies; the date is a step within it.
- Confirmed
- The date is set in law, in an adopted EU act or by an official announcement.
- Expected
- An official target or timetable, not yet fixed in law or liable to move.
- Proposed
- In consultation or draft; it may change or not happen.
Where it applies
- NI
- Applies in Northern Ireland: Stormont rules, and EU rules that reach NI under the Windsor Framework.
- UK
- Applies across the UK, Northern Ireland included (some UK taxes apply in England and NI only; the row says so).
- GB
- Applies in Great Britain only. Listed where it affects NI firms with GB sites, or opens a gap with NI.
- EU
- An EU rule that does not apply in NI as such, but reaches NI firms through EU customers, subsidiaries or later adoption.
- UK–EU
- A decision taken jointly by the UK and the EU.
Northern Ireland sits under two rulebooks. EU rules on goods, chemicals, packaging design, F-gases, batteries and deforestation apply in NI under the Windsor Framework, while UK rules on carbon pricing, CBAM, ESOS and most taxes apply too. Rows marked EU are there because they reach NI firms through EU customers, not because they apply in NI. This page is general information, not legal or tax advice: check the source for your own goods and sites.
Data and sources
The full list, with every field on this page plus the detail and notes, is free to download and reuse with credit. Dates were first gathered from this site’s dashboards (EU Law and the Windsor Framework, the CBAM Exposure Tracker and the five Focus on dashboards), the Focus on issues and the Policy series, then each one was checked on 11 November 2026 against the official page linked in its row: GOV.UK, HMRC, legislation.gov.uk, DAERA and NIEA, the Department for the Economy, the NI Assembly, the Utility Regulator, the FCA, the European Commission, EUR-Lex and the Irish EPA. Commercial and energy-broker sites are not used. Notes in a row say where a date rests on a month only, a draft or a press report of a draft.
- GOV.UK
- CBAM: technical guidance for monitoring, verifying and reporting emissions (HMRC, updated 10 November 2026) (H063)
- UK/EU Summit 2026: Key documents (Cabinet Office, 20 November 2026) (H003, H071)
- Rates for the Carbon Border Adjustment Mechanism (HMRC, updated 20 October 2026) (H011)
- Moving, exporting or placing deforestation-free products on the market in Northern Ireland (GOV.UK, updated 27 August 2026) (H008, H034)
- How to comply with ESOS phase 4 (GOV.UK, published 30 July 2026) (H009, H042, H061)
- Carbon Border Adjustment Mechanism: policy summary (HMRC, updated 2 November 2026) (H010, H048, H050, H058)
- UK-EU linking agreement: explainer (DESNZ, 20 November 2026) (H069, H070, H072)
- Proposed implementation of fixed price certificates into the UK-wide RO schemes (DESNZ, 3 November 2026) (H016)
- CBAM: a consultation on sectoral scope expansion to include refinery products (HM Treasury and HMRC, 28 October 2026) (H018)
- Proposed update and consolidation of NI's domestic legislative framework for food contact materials (FSA, 5 November 2026) (H019)
- EU batteries regulations in Northern Ireland (GOV.UK, updated 17 October 2026) (H021, H037)
- UK ETS scope expansion: domestic maritime, main Authority response (GOV.UK) (H023, H056)
- Simpler Recycling: workplace recycling in England (GOV.UK) (H025)
- Budget 2026, HC 726 (HM Treasury, 28 October 2026) (H026, H035, H036, H052, H053)
- VENSAV2083: VAT rates for energy-saving materials with commencement dates (HMRC manual) (H027)
- Plastic Packaging Tax: mass balance approach and removal of pre-consumer plastic (HMRC policy paper) (H028)
- Landfill Communities Fund value 2027 to 2028 (HMRC, 28 October 2026) (H029)
- Taxation of company cars: appropriate percentage for 2025–26 to 2027–28 (HMRC policy paper) (H030)
- Explanatory memorandum on Regulation (EU) 2024/3015 (UK Government, 4 November 2026) (H043)
- Taxation of company cars: appropriate percentage for 2028–29 and 2029–30 (HMRC policy paper) (H055)
- DAERA and NIEA
- Farm Sustainability Payment conditionalities (DAERA, 23 February 2026) (H032, H057)
- Extended Producer Responsibility: deposit return scheme for single-use drinks containers (DAERA, updated 14 April 2026) (H039)
- Muir welcomes Assembly approval of emissions targets (DAERA, 11 December 2024) (H046)
- Packaging EPR regulatory position statement (NIEA, September 2026) (H049, H060)
- Consultation on the Nutrients Action Programme 2027–2030, section 4.2.3 (DAERA, June 2026) (H051)
- EUR-Lex
- Regulation (EU) 2024/573 on fluorinated greenhouse gases, Annexes IV and VII (EUR-Lex) (H012)
- Directive (EU) 2026/470 (Omnibus I), Official Journal, 26 February 2026 (EUR-Lex) (H022, H059)
- Commission Regulation (EU) 2024/2462 (EUR-Lex) (H041)
- Regulation (EU) 2025/2439 amending the CLP revision's application dates (EUR-Lex) (H047)
- Utility Regulator
- European Commission
- NI Assembly
- legislation.gov.uk
- NetRegs (NIEA and SEPA)
- Environmental Protection Agency (Ireland)
- ECHA (via EMA)
- data.consilium.europa.eu
- Department for the Economy
- Financial Conduct Authority
- Causeway Coast and Glens Borough Council
- oeil.europarl.europa.eu
What changed
- 16 Nov 2026: Links to Policy series pieces marked as updated: the pieces were rechecked and corrected on 16 November 2026. No dates in this list changed. 68 items.
- 11 Nov 2026: CBAM dates corrected and extended after a review: the first UK CBAM rates move to December 2026 (HMRC publishes them by the start of each quarter); EU certificate sales dated 1 February 2027; the refinery consultation close marked confirmed; the £50,000 forward test described correctly; the split 2028 UK returns added (31 July and 29 September); added the HMRC guidance feedback close (13 November), the EU ETS review target (11 December), the pending Commission CBAM acts and the proposed 2028 EU downstream extension. 68 items.
- 9 Nov 2026: Published, approved by Robert on 9 November 2026. 62 dated items from November 2026 to December 2028, drawn first from this site’s dashboards, Focus on issues and Policy series, then checked against the official source for each row on 9 November 2026.
Rechecked when a source moves and at least monthly. Tell me about a date I have missed: contact. More: NI Consultations Monitor · EU Law and the Windsor Framework · CBAM Exposure Tracker · all dashboards.
Which of these dates are yours?
A free 30-minute first call is the place to start: we go through your products and trade, and which of these dates reach you under the UK and EU rules. The fixed-price Two-Regime Readiness Review, which turns this page into your own written 12-month plan, opens for booking shortly.
Book a free first callOr ask a question first