Robert J. Park · Dashboards

NI construction and building

NI construction output in early 2026 was 10% above a year earlier and housing 27% above. NI Water says around £7bn is needed for wastewater, and capacity limits decide where homes can connect.

Construction output, Q1 2026
116.5
Index, 2023 = 100; +10.1% on a year earlier
Housing output, Q1 2026
+27.4%
On a year earlier; index 131.8
Output, Q2 2026
−1.7%
On the quarter; +3.5% on the year
Wastewater investment needed
£7bn
NI Water estimate
Belfast storm overflows unsatisfactory
156 of 192
NI Water, January 2026
Homes unlocked since autumn 2024
5,300
By £30m extra wastewater funding

The figures

Output by type of work, Q1 2026

Volume index, 2023 average = 100. Provisional.

All construction116.5
New work117.9
Housing131.8
Infrastructure101.6
Other work113.2
Repair and maintenance111.9

Source: NI Quarterly Construction Bulletin, Q1 2026 (NISRA, 25 June 2026)

Change on a year earlier, Q1 2026

Percentage change in volume. Green is growth.

All construction+10.1%
New work+18.6%
Housing+27.4%
Infrastructure+3.9%
Other work+0.7%
Repair and maintenance−2.5%

Source: NI Quarterly Construction Bulletin, Q1 2026 (NISRA, 25 June 2026)

NI emissions by sector, 2024

Net emissions 18.4 MtCO2e. The highlighted sector is the one this dashboard covers.

Agriculture5.8 Mt · 31.4%
Domestic transport3.9 Mt · 21.3%
Buildings and product uses2.8 Mt · 15.5%
Land use (LULUCF)2.1 Mt · 11.7%
Electricity supply2.0 Mt · 10.8%
Industry1.0 Mt · 5.5%
Waste0.7 Mt · 3.8%

Source: NI greenhouse gas inventory 1990–2024 statistical bulletin (DAERA/NISRA)

Change since the base year

Percentage change in each sector, base year (1990 for most gases) to 2024. Red is a rise, green a fall.

Agriculture+10.0%
Domestic transport+9.2%
Buildings and product uses−36.7%
Land use (LULUCF)−18.2%
Electricity supply−62.6%
Industry−69.4%
Waste−52.9%

Source: NI greenhouse gas inventory 1990–2024 statistical bulletin (DAERA/NISRA)

Rules on materials, land and connections

What applies to NI contractors, developers and merchants.

RuleWhenWhat it means
UK CBAM1 Jan 2027Imported iron, steel, aluminium and cement of any non-UK origin, EU included (HMRC: no jurisdiction is exempt), once covered imports pass £50,000 in any 12 months; register by 31 Jan 2028
EUDR (timber)30 Dec 2026First placers of wood and wood products on the NI market, micro and small businesses included (timber was already under the EU Timber Regulation; the 30 Jun 2027 date is for other products)
Contaminated land regimeNot commencedPart 3 of the 1997 Order not in force; contamination handled through planning
Wastewater developer contributionsVoluntary scheme plannedAnnounced 19 March 2026; compulsory levy still under consideration

Source: CBAM policy summary (HMRC, updated 2 November 2026); CBAM for Northern Ireland businesses (April 2026); EUDR application dates (European Commission); Deforestation-free products in NI (GOV.UK, updated 27 August 2026); Contaminated land (DAERA); Developer contributions for wastewater infrastructure (DfI Written Ministerial Statement, 19 March 2026)

Context

Wider figures behind the issue.

MeasureFigure
Construction jobs, year to Sept 2024+2,040 (+5.5%)
Output vs pre-pandemic (Q4 2019), Q2 2026+17.5%
New dwelling starts, April to June 20261,502 (746 fewer than a year earlier)
New dwelling completions, April to June 20261,571
UK emissions the built environment is directly responsible forAbout a quarter (UKGBC, UK-wide)
Share of built environment emissions from construction and refurbishmentAbout a fifth (UKGBC)

Source: NI Business Register and Employment Survey 2024 (DfE/NISRA, 8 October 2026); Construction output statistics, Q2 2026 (NISRA, 24 September 2026); Whole Life Carbon Roadmap FAQs (UK Green Building Council); NI Water update to Belfast City Council (NI Water, 28 January 2026); New dwelling statistics, Q2 2026 (DoF/NISRA, 19 August 2026)

Sources

Every figure on this page comes from these sources, checked on 20–21 October 2026; CBAM, timber, housing supply and release dates re-checked on 9 November 2026. Q3 2026 output figures are due on 14 January 2027. Figures marked "derived" are worked out from the published numbers. This is a dated snapshot: nothing is fetched or sent, and every chart can be downloaded as CSV.

Commentary: Focus on Construction & Building, 9 November 2026. More dashboards: all dashboards.